Return to Cases
Rail TransitMetro Construction Company

Metro Tunnel Ventilation and Smoke Extraction Systems

Metro Tunnel Ventilation and Smoke Extraction Systems

Key Result

Tunnel fans and high-temperature smoke extraction motors pass fire safety tests for reliable line operation.

Metrics

Passed on the first try

Fire acceptance

~20%

Ventilation energy

12

Covered stations

Testimonial

Smoke extraction motors passed fire acceptance on the first try, and daily ventilation energy consumption is lower than the previous design. — M&E Systems Engineer, Metro Construction Company